International Interior Design Association
Topic: Projects

EMCOR Subsidiary To Provide Upgrades For California State University Channel Islands

11.5.08 | Norwalk, CT | EMCOR Group, Inc. subsidiary, University Marelich Mechanical will upgrade and convert mechanical systems for the California State University Channel Islands. The company will install the HVAC and plumbing systems and will convert purchased steam into chilled and heated water. 
Reply | PermaLink | Channels: Projects

Ever Vail Project Awarded Leed Platinum In Building Pilot Progam

11.5.08 | Vail, CO | The Ever Vail village development project was awarded Platinum in a new LEED Green Building Pilot Program, Neighborhood Development. The LEED-ND rating system encourages environmentally superior development that brings elements together into a neighborhood and relates the neighborhood to its larger region and landscape. Strategies under consideration include the restoration and enhancement of Red Sandstone Creek and associated onsite wetlands and
selecting a previously developed and environmentally degraded site as opposed to using a previously undeveloped site.

EMCOR Subsidiary Awarded Contract For Hard Rock Hotel And Casino

10.31.08 | Las Vegas, NV | EMCOR Group subsidiary, Dynalectric Nevada will install the electrical systems at the Hard Rock Hotel and Casino, Las Vegas, NV. The three phase expansion project includes lighting, power, tele/data, and the fire alarm life safety systems. www.EMCORGroup.com.
Reply | PermaLink | Channels: Projects

Accents By Design Completes Tower Club Improvements

10.31.08 | Reston, VA | Jacqui Higgins, president of Accents by Design, announced that the firm completed annual design improvements for the Tower Club in Fairfax, VA. Improvements to the Tower Club include the installation of the first company logo and adding warmer woods and fabric tones in the casual dining area.

Reply | PermaLink | Channels: Projects
officesite, inc.
publisher of officenewswire,
the news wire for
office professionals

SpecSimple Ad